As part of the scoring notice update, HUD has included a new requirement that at the end of each REAC Inspection, the property must do a full inspection of its own and then report the findings and repair records to HUD.

Completion of a Post-report Survey: At the completion of a REAC inspection, the owner or PHA must review the inspection report and perform a survey of units not inspected and provide that information to HUD. For properties that scored at or above 60, the survey may be limited to inspecting for deficiencies based on the inspecting entity’s inspection findings. For properties that scored below 60, the owner or PHA must conduct a survey of the entire project, including all units, inside areas, and outside areas, for any deficiency and must electronically submit a copy of the results of the survey to HUD. (§ 5.711©(2))

Revision: 1
Last modified: 21 July 2023

Feedback

Thanks for your feedback.

Post your comment on this topic.

Please do not use this for support questions.
https://go.us-hc.com/getNSPIRE

Post Comment